Muga valley forests pioneer climate credits: 58 healthier hectares that will store carbon and save water
Catalonia’s first forest climate-credit project has been completed in the upper Muga valley in the Alt Empordà: 57.8 hectares of woodland in Albanyà, Cabanelles and Sant Llorenç de la Muga were managed between summer 2023 and this autumn, paid for by companies buying credits at €4,400 each. Over fifteen years the work should lock up about 5,000 tonnes of CO₂ and save more than 165,000 cubic metres of water, which will feed the Darnius-Boadella reservoir.
The Fundació Pioners del Nostre Temps and Catalonia’s Forest Ownership Centre have completed the region’s first forest climate-credit project. It ran for three years, from summer 2023 to autumn 2026, covering 57.8 hectares of woodland in Albanyà, Cabanelles and Sant Llorenç de la Muga in the Alt Empordà.
How it works
The idea is simple: a company or institution buys a credit for €4,400, which pays for work on one hectare of forest. Fifty-eight were sold, most of them to ATL, the public company that supplies bulk water in the Ter-Llobregat system, for a total of €256,900. With that money forest owners carried out work to make the woods healthier and more resistant to drought and fire.
What to expect
According to the promoters, over the next fifteen years these forests will lock up about 5,000 tonnes of CO₂ and save more than 165,000 cubic metres of water, which will reach the rivers instead of being lost. Part of it will flow into the Darnius-Boadella reservoir, which supplies much of the Alt Empordà and is currently 60% full, the lowest in Catalonia’s internal basins. A second phase covering 120 hectares is being prepared.
Why it’s good news
The Empordà’s forests, often neglected and full of fuel, are one of the big risks every summer. Getting water-dependent companies to pay for good management of headwater woodland is a way of looking after the land — and, along the way, the kitchen tap.
The project
- 57.8 hectares in Albanyà, Cabanelles and Sant Llorenç de la Muga.
- 58 credits at €4,400: €256,900 invested.
- About 5,000 tonnes of CO₂ stored over fifteen years.
- Second phase in preparation: 120 hectares.
Sources: NacióDigital · ACA (embassaments) ·