← Front pageThe Costa Brava TimesCAES

Water

Treated wastewater as a savings account: a Llançà plant would recharge the Costa Brava’s coastal aquifers

· · Llanca
Share

The Costa Brava water consortium wants to build a regeneration plant in Llançà, on the northern Costa Brava, as part of its Aiguaneix project: it would further purify water from the sewage works and inject it into aquifers at risk of running dry and turning salty. Two lines of 50 cubic metres an hour would inject about 300,000 cubic metres a year — around 30% of Llançà’s annual use, according to technical director Lluís Sala. The model could be repeated in Cadaqués, and a pilot plant has been running in Roses since March, born of the 2021–2025 drought in the Muga basin. An agreement with the Catalan Water Agency is still pending, and there is no cost or date.

Source: El Gerió · · Updated