Industry
Seat halts a Martorell line again over a shortage of Chinese battery cells
Seat cancelled Friday’s night shift on line 1 at its Martorell plant near Barcelona, which builds the Cupra Raval and the Volkswagen ID. Polo, after a logistics problem left it short of battery cells, mostly supplied by China’s CATL. It is not the first time: the line stopped for two days at the end of October and lost other night shifts in November. Martorell builds about 2,210 cars a day, 880 of them electric, and its €300m battery plant assembles about 900 packs a day, well short of the 1,200 target. The Raval, the brand’s small electric car, has more than 60,000 orders.